• Tranformer Forced Oil Water Cooling System
  • Tranformer Forced Oil Water Cooling System
  • Tranformer Forced Oil Water Cooling System
  • Tranformer Forced Oil Water Cooling System
  • Tranformer Forced Oil Water Cooling System

Tranformer Forced Oil Water Cooling System

After-sales Service: 24h
Warranty: 12m
Certification: ISO
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Tranformer Forced Oil Water Cooling System pictures & photos
Tranformer Forced Oil Water Cooling System
US $10,000 / Piece
Min. Order: 5,000 Pieces
Gold Member Since 2020

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory

Basic Info.

Model NO.
YSFH-125
Application
Cooler
Principle
Regenerative Heat Exchanger
Style
Steel Type
Material
Copper
Transport Package
Plywooden/Iron Pallet
Trademark
COXIN
Origin
China
HS Code
8418699090
Production Capacity
50000PCS/Year

Packaging & Delivery

Package Size
20.00cm * 30.00cm * 40.00cm
Package Gross Weight
45.000kg

Product Description

[#Transformer Forced Oil Circulation Water Cooler#] Products Overview
The YS-type tubular cooler is an industrial heat exchanger on the principle of using water to cool oil which is designed by absorbing the technical processes such as Germany and Japan. It is generally composed of a casing, a core group, an end cover, a leak alarm, and a valve. The cooling system consists of a cooler, an oil pump, a control box, pipes, a base, a valve, a pressure gauge, and so on.

• Make the annular groove in the hole of the tube plate, and firmly fit into the hole of the tube plate after expansion, to ensure no leakage;
• Advanced mechanical and hydraulic expansion equipment and domestic leading expansion technology with full expansion and high cooling efficiency;
• Double tube design, external oil circulation of the outer tube, internal water circulation inside the inner tube, and a diversion chamber between the inner and outer tubes. When the oil or water path leaks, the medium will enter the effusion chamber along the diversion chamber and flow into the leak alarm, and then trigger the alarm to avoid the mixing of oil and water, which plays a double protection role. This special safety design can make the pressure of the cooling water in operation not limited by the oil pressure.


[#Transformer Forced Oil Circulation Water Cooler#] Products Parameters
Tranformer Forced Oil Water Cooling System

Tranformer Forced Oil Water Cooling System

[#Transformer Forced Oil Circulation Water Cooler#] Company Profiles*Exhibitions
Tranformer Forced Oil Water Cooling SystemTranformer Forced Oil Water Cooling System
[#Transformer Forced Oil Circulation Water Cooler#] Company Profiles*Certificates

Tranformer Forced Oil Water Cooling System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Tranformer Forced Oil Water Cooling System pictures & photos
Tranformer Forced Oil Water Cooling System
US $10,000 / Piece
Min. Order: 5,000 Pieces
Gold Member Since 2020

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
5000000 RMB
Plant Area
>2000 square meters